|
Picking Up at City Yard and Installation of Portland Loo for Baker Park. This Includes Power Conduit Installation, 4" Sanitary Sewer Laterals, 1, 4" Cleanouts, 400 LF Of 1.5" Water Service, Concrete and Sidewalk Work. Note: Installation Will Require a Plumber and an Electrician. To download Bid Documents and Construction Drawings, please click below on "Related Documents"
|
|
9/14/2023 9:00 AM
|
|
Open Until Contracted
|
|
09/28/2023 (3:00PM)
|
|
09/26/2023
|
|
09/21/2023 (11:00AM)
|
|
Kurt Clark (541)450-6110 kclark@grantspassoregon.gov
|
|
Documents and Drawings may be picked up at the City of Grants Pass Community Development Office or downloaded by clicking on "Related Documents" below.
|
|
If you have downloaded the plans and documents and would like to be placed on the plan center or plan holders list, please contact Megan Smith at (541) 450-6078 or msmith@grantspassoregon.gov
|
|
Temporary Features and Appurtenances, Road Work, Drainage & Sewers, Wearing Surfaces, Right of Way Development and Control and Water Supply Systems.
|
|
|