The Project Will Consist of The Installation of Approximately 105 Lineal Feet of 16” Water Pipe and Fittings, and Associated Appurtenances. Also Included With the Project Will Be Concrete Work and Asphalt Pavement and Patching.
To download Bid Documents and Construction Drawings, please click below on "Related Documents"
|
|
5/12/2022 9:00 AM
|
|
Open Until Contracted
|
|
05/26/2022 (3:05PM)
|
|
05/19/2022 (11:00AM)
|
|
Kurt Clark (541) 450-6060
|
|
Documents and Drawings may be picked up at the City of Grants Pass Community Development Office or downloaded by clicking on "Related Documents" below.
|
|
If you have downloaded the plans and documents and would like to be placed on the plan center or plan holders list, please contact Megan Smith at (541) 450-6078 or msmith@grantspassoregon.gov
|
|
Temporary Features and Appurtenances, Road Work, Wearing Surfaces, Right of Way Development and Control and Water Supply Systems
|
|
|