Slayden has completed the excavation of the stormwater retention basin and demo of the slab that was found at the bottom. Compost was then spread at the basin, the Hydroseeding will occur in the next two weeks.
A trench patch (asphalt) has been scheduled for the road for September 14th. The fence and gate are complete.
Lastly, Slayden has completed the screening of the dirt and the garbage. It will all be hauled off next week along with the concrete and asphalt.