Status |
Notice to Reject Bids Posted |
Estimated Completion Date |
|
Description |
This Project will Consist of Installing Approximately 69 LF of 12” Stormdrain Pipe, 5 Concrete Inlets, 2 Stormdrain Manholes, Paving and Sidewalk Repairs, Striping, and 132 SF of Concrete Raised Pedestrian Crossing. |