Description |
The project will consist of the installation of approximately 3,140 Lineal Feet of 12" Ductile Iron Water Main Pipe of which 170 Lineal Feet to be bored with a 36" Steel Casing underneath Interstate 5, installation of three Fire Hydrants and Asphalt Paving. |