Fruitdale Creek - Hamilton Lane Trail

Project Details

Project Details, including: project name, number, status, engineer, contractor, start, completion, final amount, and project description
Number TR4719
Status Completed
Engineer ZCS Engineering, Inc.
Contractor Robco, Inc.
Construction Start
December 1, 2016
Completion Date
March 31, 2017
Contract Amount
Project Description
The project consisted of the construction of an asphalt pedestrian pathway (approximately 1,350’ in length) from Fruitdale drive to Hamilton lane. Retrofitting an existing wooden pedestrian bridge (approximately 27’ in length) that crosses over Fruitdale creek. Constructing a new wooden pedestrian bridge (approximately 37’ in length, with a standard concrete abutment) to cross over the Grants Pass irrigation canal. Installation of wood fencing, a single concrete storm drain inlet and associated storm drain pipe, concrete curb and gutter, concrete retaining wall, bollards, roadway striping, and installation of a pair of solar powered rectangular rapid flashing beacons.