Savage Street Bridge

Project Name: Savage Street Bridge
Project Number: TR6165
Status: Under Construction
Engineer: ZCS Engineering, Inc.
Contractor: Timber Mountain, Inc.
Construction Start: May 16, 2016
Estimated Completion: November 1, 2016
Contract Amount: $749,720.00
Project Description: Removal of a Large Existing Concrete Culvert, Installation of a New 40’ Span Bridge on a Driven Pile Foundation, Installation of Concrete Fish Passage Structure within a Fish Bearing Stream, Replacement of Existing Sanitary Sewer and Water Pipe Section, Installation of (2) Water Quality Storm Drain Catch Basins and Associated Storm Drain Pipe, and Associated Roadway Surface Improvements. Construction will Require Engineered Shoring for Bridge Foundation Installation and the Contractor Must Comply with Project Related Permits (E.G. In-Water Work an a Fish Bearing Stream).